Peak Evolution were awarded the contract to install a new Comms Room within a live building keeping day to day operations still possible. This included a new 3 phase supply backed up via generator, new structured data cabling throughout, new air conditioning units and removal of radiant panel heaters. All designed and carried out with our in-house team providing the client with a fit out package from design to completion.
Duration
12 weeks
Works Completed
Building, M&E, Client Spec Fitout
Project Features
* Full design
* Surge Protection
* Access Control
* Air Conditioning
* Intercom
* LED Lighting design and installation
* UPS
* ATS
* Networking cabling and termination.
* Plumbing alterations