Peak Evolution were awarded the contract to fully fit out a new petcrematorium taking on the roles of Principle andMain Contractor in the centre of Belper. Following the initial site clearance we provided a full installation from a bare shell to provide,new office space, toilet, open Warehouse space, a reception and chapel of rest. The areas boast air conditioning, LVT flooring and LED lighting. Peak Evolution also co-ordinated the required enabling works and crane lift of the diesel furnace.
Duration
12 weeks
Works Completed
Building, M&E, Client Spec Fitout
Project Features
Full design
Rip out of old warehouse unit
Supply and Installation of bespoke joinery items to suit required layout.
Full M&E package.
Decoration
Drylining and suspended ceiling installation
Lighting design and installation
Flooring
EV Charger
Principal Design and Main Contractor Roles